2210
ADHESIVE FILLER STANDARD

Formerly

The proven solution - not only for insulation systems

For easy gluing, filling and levelling of problematic areas.

  • Adhesive filler for bonding insulation boards: To create exterior thermal insulation composite systems (ETICS). Protects from heat and cold, increases the living comfort.
  • With good adhesion: For mineral wool, EPS and for plinth insulation with XPS.
  • As a levelling compound to create new substrates under the finishing plaster.
  • For old and new mineral plasters and for covering problematic areas in masonry when embedding reinforcing glass fibre mesh.

Area of application

  • Outdoors: wall + ceiling
  • Indoor: wall + ceiling

Processing method

  • For hand processing
  • Suitable for adhesion and levelling of insulation systems.
  • For levelling aerated concrete and thermal insulators.
  • For overlaying problematic areas in masonry or conventional plaster.
  • For the plinths of the house.
  • Substrate for thin-layer finishing plasters.

Processing details

Learn more about technical details for processing this product.

Substrate requirement

The substrate must comply with the applicable standards, be solid, free of loose parts, free of dust, paint, release agent residues and efflorescence. It must be sufficiently rough, dry and uniformly absorbent. The surface must not be frozen or water-repellent. The substrate must be dimensionally stable and level.

Substrate preparation

Depending on substrate water absorption and climatic conditions, the following is needed: Use Cemix 2613 primer on absorbent substrates, roughen smooth substrates or use Cemix 2620 or Cemix 8040 contact bridge. Alternatively, modify the substrate with a suitable method to achieve the desired properties. The substrate must comply with applicable standards, or material manufacturer's recommendations.

Preparation of the mixture

Pour the dry mixture into the prescribed amount of water and mix thoroughly into a homogeneous mass without lumps. Leave to stand for about 5 minutes and then stir the mixture briefly again.

Water demand

CEMIX_blue_handling_water-quantity_25kg_6,0-7,5l
Quantity Liters (Min) Liters (Max)
25 kg 6 L 7.5 L
1 kg 0.24 L 0.3 L

Mixing

CEMIX_blue_handling_swirl_5min800x CEMIX_blue_handling_rest_3min
Mixing time
5 min
Mixing speed in Rpm
800x/min
Ripe time
3 min

Processing instructions

Bonding the insulation: the mineral wool thermal insulation is first thinly coated at the bonding points (the adhesive is rubbed into the surface of the insulation) and the required amount of adhesive is applied immediately afterwards. The adhesive shall be applied to the reverse side of the insulation board, either as a continuous strip around the perimeter and at least three targets in the middle, or all over with a tooth trowel. In the case of all-over bonding, the compound is applied with a tooth trowel; the height of the tooth of the trowel is chosen according to the flatness of the substrate (min. 10 mm for an ideally flat substrate). In the case of mineral wool with perpendicular fibres (lamellae), always apply the adhesive all over! In the case of machine processing, the adhesive can also be applied to the substrate in a serpentine pattern so that the spacing is approx. 200 mm. Bond the thermal insulation boards to the adhesive applied in this way. The active adhesive time is approx. 20 minutes, so only apply the adhesive to an area that can be safely lined during this time. The minimum bonding area must meet the requirements prescribed by the manufacturer of the thermal insulation system and is based on the method of bonding and mechanical anchoring of the thermal insulation boards. The bonding and trowelling system is described in detail in the Cemix thermal insulation system technological documents.
Base layer application: Before the the base layer is applied must be applied the corner, termination, connection, expansion strips and reinforcement (at the corners of the openings, at the junction of the different insulants, etc.). The total recommend thickness of the reinforcement layer is 3mm. The reinforcing mesh shall be placed 1/2 to 1/3 of the thickness of the reinforcement layer from the outer surface and covered with a minimum 1 mm layer. After the final alignment of the reinforcement layer, the reinforcing mesh must not be exposed (even after grinding out any irregularities). The substrate thus prepared is used for the application of the top plaster.
Consumption - bonding of insulation : 4.0 - 6.0 kg/m2
Consumption - leveling of base layer : 3.0 - 6.0 kg/m2

Application thickness

CEMIX_blue_techdata_5_2mm
Minimum layer thickness 2 mm
Recommended layer thickness 3 mm
Maximum layer thickness 5 mm

Consumption

CEMIX_blue_techdata_trowel_1,25kg-1mm
Material consumption min.
7
Material consumption max.
12
Material consumption in measuring unit
kg/m²

Yield

Material consumption at unit Yield
25 kg lepení bodově lepení bodově 5,2 m²
25 kg základní vrstva 3 mm provedení základní vrstvy 6,25 m²

Working time (potlife)

CEMIX_blue_handling_trowel_180min

180 min

Treatment after application

Avoid sun, heat, humidity and draughts. Protect from frost and rain. Direct heating of the surface is prohibited.

Tool and cleaning instructions

Wash off tools with water immediately after finishing work. Clean dried residues mechanically.

Technical parameters

Main binder Grey cement
Made of material Mineral filler, cement, redispersible polymer and other special additives that improve the processing and performance properties of the mortar.
Flammability class A1
Max. grain size 0,7mm
Adhesive tensile strength RT bearing on insulation material in ≥N/mm² 0.08
Adhesion after dry storage in ≥N/mm²(ETAG004) 0.25
Adhesive tensile strength after water storage and 2h drying in ≥N/mm² (ETAG004) 0.08
Adhesive tensile strength after water storage and 7days drying in ≥N/mm² 0.25
Durability 10
Thermal conductivity λ in W/(m.K) 0.49
Water vapour diffusion resistance factor µ 18

Files

Technical datasheet
Working Instructions
Simple Transactional Email